It connects via tunnel to the underground Bass Library, which holds an additional 150,000 volumes.
SCT has a tunnel furnace using hydrogen for brazed assemblies in high production series.
We'll be back first thing tomorrow to get started on the tunnel.
I remember thinking it would take a man 600 years to tunnel through the wall with it.